Tmt comp background

Image Gallery

Picture2
February 19th, 2019

In December 2018, India TMT signed a contract with L&T Company for the production of the Segment Support Assemblies, a major component of TMT’s main mirror hardware.

Lab visit 20181210 18fkc31667crop
December 20th, 2018

Visit of TMT Technical Laboratory on December 10, 2018

Lab visit 20181211 18fkc31692crop
December 20th, 2018

Visit of TMT Technical Laboratory on December 11, 2018.

Lab tournteciworkshopdec2018 18fkc31635
December 10th, 2018

Group of TECI graduate students, postdoctoral researchers, and early-career professionals from partners in the Thirty Meter Telescope International Observatory visiting TMT Lab on 6 December 2018 during the annual TECI workshop. The workshop is designed to support international collaboration among the TMT partners including Caltech, Canada, China, India, Japan, and University of California. A full week program to build community among TMT future users and leaders, and connect them to current TMT leaders.

18fkc20321crop
September 17th, 2018

TMT optics and system engineers and international review committee photographed at TMT’s headquarters in Pasadena on July 26, 2018 during M1S Final Design Review.

18fkc20477medium
August 15th, 2018

Engineers from TMT project office were happy to welcome TMT International Observatory (TIO) Board Members at their technical laboratory near Pasadena. The visit was organized over the course of TIO Board of Directors meeting on Tuesday 31 July 2018. This was a unique opportunity to present the multi segment integration and test facility that will be used to verify and test all TMT primary mirror system components and assemblies prior to full-scale production. TIO Board Members are pictured in front of the primary mirror cell prototype that will host seven full size segments to verify the performance and operation of the primary mirror control system.

18fkc20463medium
August 15th, 2018

Mockup of the high pressure CO2 cable wrap at the TMT technical laboratory. Thomas Chylek, TMT opto-mechanical engineer (seen from the back) is holding a CO2 gun to demonstrate the testing of the cleaning process that will be used to drive any dust particle off the TMT mirror surfaces (primary, secondary and tertiary mirrors).

18fkc20433medium
August 15th, 2018

Alastair Heptonstall, TMT opto-mechanical engineer, is testing the guide flexure of the M1 segment to measure the component stiffness. Each TMT individual segment must be controlled to create a continuous M1 mirror. TMT control system can move segments individually and the guide flexures allow the segments to move while resisting lateral motions. This test is part of the performance assessment to ensure the control system can align the mirror to achieve the required telescope performance.

18fkc20419medium
August 15th, 2018

Glen Cole, TMT lead optical fabrication engineer, explains the technical steps involved in the integration of the glass segment with the new segment support design, prior to carrying out the optical test validation. The assembly tool is seen in the background. TIO Board members are looking over the safety perimeter of the spherical segment, which is guarded under a piece of protective black foam.

Dsc03924  edited
August 14th, 2018

Akamai interns from TMT and UC Santa Cruz surrounded by their mentors at TMT project office in Pasadena for the 2018 internship symposium on Tuesday 14 August, 2018.

07162018group photo edited
August 3rd, 2018

Representatives from TMT’s MICHI team, including Professor Chris Packham (UTSA & NAOJ), Mitsuhiko Honda (Kurume University, Japan), Professor Gregory Herczeg (PKU, China), Professor Lei Hao (SHAO, China), representatives of TMT-China office and Chinese Astronomers and engineers

Image5
June 26th, 2018

Keoki, Olivia and Erica, TMT Akamai interns for 2018 on their first day at TMT office are welcome by their mentors.


Displaying entries 49 - 60 of 90 in total