For more information about TMT Hawaii, please visit https://www.maunakeaandtmt.org and https://www.maunakeaandtmt.org/get-the-facts
Tmt comp background

The Observatory

E471c4dfe76fb679ba691682c624fbb46ed55b9f

Coffee Chat on Mirror Segment Fabrication

July 9th, 2019

TMT staff Glen Cole and Christophe Dumas have a coffee-break conversation about Glen’s last trip to Japan and update on TMT mirrors fabrication and verification.

F34197bceaf4a77be2231102e1b7c0b6576d3afc

Segment Support Assembly (SSA) Pre-Construction Meeting at Larsen & Toubro in India

June 24th, 2019

Pasadena, CA (June 06, 2019) – A Segment Support Assembly (SSA) “pre-build” meeting at the Coimbatore facility of Larsen & Toubro (L&T) was successfully completed on May 22, 2019. The meeting was...

Efea523f22a8190ce5efe5de61dabd89fabd1a9b

CILAS to make adaptive optics mirrors for giant Hawaii telescope

June 20th, 2019

TMT featured in the business news of optics.org, the leading online resource for professionals working and using photonics based technologies. Optics.org delivers daily coverage of the optics &...

670d94dc62c764aff981bb51d6a4d4f9dca7c661

TMT Executive Software Successfully Passes First Phase of Final Design Review

May 28th, 2019

Pasadena, CA – May 15, 2019 – The TMT Observatory Executive Software (ESW), which will provide the core functionality needed to enable observations of science programs for on-site and remote...

138ba8a8ed96e9e6ee7c70f0b6141e52801917cc

TMT Adaptive Secondary Mirror Passes Conceptual Design

October 18th, 2018

Pasadena, CA - Sept. 25, 2018 – The TMT Project Office recently held a conceptual design review to evaluate the design study for the TMT’s Adaptive Secondary Mirror (AM2) system.

A2679dca7c9aff15b673736bfa07420e3616fb38

TMT Executive Software Successfully Passes First Phase of Preliminary Design Review

October 11th, 2018

Pasadena, 5 October, 2018 - The TMT Observatory Executive Software (ESW) has passed a key milestone and is now ready to enter final design phase. An ESW Preliminary Design Review phase1 (PDR1)...

11541d2b96b4e33b692cc9421ec4a303598bfa80

The TMT Primary Mirror System Successfully Passes Final Design Review

September 10th, 2018

PASADENA (July 26-27, 2018)– The Thirty Meter Telescope Optics Group recently achieved a critical milestone by passing its Primary Mirror Optics System (M1S) final design review. The review board,...

1403fb903b02e29b50a38cd553614f1fbdc051fb

Thirty Meter Telescope’s Cryogenic Cooling System Passes Conceptual Design Review

August 29th, 2018

PASADENA July 11, 2018 – The conceptual design of TMT’s Cryogenic Cooling System (CRYO) has passed its conceptual design review. Engineers from the Technical Institute of Physics and Chemistry...

780f14cabcf311fd8c71ec4ad518f4ddbeb343dc

TMT Telescope Control System (TCS) Making Progress Toward Preliminary Design Review

June 19th, 2018

Work is moving forward on TMT’s Telescope Control System (TCS), which is responsible for the coordination and control of the various telescope subsystems, responding to commands received from the...

1209fdb2e987cefec6ddb348936ad169f739de0a

TMT Engineering Talks Series: Wednesday 6th June, 9.00am (PDT) - Roberto Biasi

May 31st, 2018

Announcing the Next TMT Engineering Talk Dr. Roberto Biasi, Microgate for the AdOptica Consortium A Conceptual Design for an Adaptive Secondary Mirror (AM2) for TMT Wednesday 6th June, 9.00am...