Image Gallery

Cleaningarmdesign
September 8th, 2020

TMT’s Primary Mirror surface will be regularly cleaned by four robotic arms. The arm devices will sweep across the mirror and spray snow carbon dioxide through an arrangement of nozzles to remove dust and small particles. The CAD model of the arm supporting the CLN system is courtesy of MELCO.

Tel m1cleaning system
September 8th, 2020

TMT’s Cleaning system for the Primary Mirror (M1) optics is automated and uses CO2 to clean the 492 mirror segments mounted in the M1 cell. Four robotic cleaning arms will sweep nozzles spraying CO2 evenly across the primary mirror. This cleaning process will be performed with the telescope locked in horizon-pointing orientation.

Renderingtmt nasmythplatforms
July 23rd, 2020

The design is showing the Nasmyth platforms (in blue) and two of our early light instruments. The TMT Wide Field Optical Spectrometer (WFOS) is located on the right platform while the Adaptive Optics system (NFIRAOS) plus the InfraRed Imaging Spectrograph (IRIS) are located on the left platform.

Wide field optical spectrometer %28wfos%29 instrument
July 23rd, 2020

A rendering of the Wide-Field Optical Spectrometer (WFOS) Instrument shown in-situ on the TMT Nasmyth Platform - WFOS is a wide field, seeing limited multi-object optical spectrometer and imager. Light from the TMT Tertiary Mirror (M3) is delivered to the WFOS Atmospheric Dispersion Corrector (ADC). The new instrument layout is optimized to be compact.

Crosssectionalviewwfos instrument
July 23rd, 2020

The WFOS design now features a vertical orientation that enables the instrument to be gravity invariant as it de-rotates the field during observations.

Screen shot 2020 06 25 at 16.00.50
June 26th, 2020

Excerpt from a Mechanical Interface Control Document showing where sonic anemometers (wind speed sensors) will be located on the telescope structure. The telescope-mounted sensors and sensor stations are identified in the Space Envelope drawings

Screen shot 2020 06 02 at 18.01.26
June 18th, 2020

Diagram of the CRYO space envelopes layout (in blue) on the Nasmyth platforms. CRYO will provide liquid nitrogen cooling to first-light instruments.

Img 0638
April 29th, 2020

First TMT M1 Metrology Frame Inspection The metrology frame, sitting on one TMT fixed frame, is being tested using advanced metrology system (pictured on the right) at TMT’s technical lab in Monrovia, April 2020.

Dsc06752
April 29th, 2020

During installation of the TMT telescope, metrology frames will be used for initial alignment of TMT Primary Mirror segments.

Tmt picture2 cut reducedsize
April 23rd, 2020

The TMT design utilizes a calotte-style enclosure, which minimizes the size and footprint of the facility, while allowing full movement of the telescope and optical systems.

Majorcomponentstmtenclosure
April 23rd, 2020

Major components of TMT Enclosure


Displaying entries 145 - 156 of 291 in total